某特高拱壩灌漿施工關(guān)鍵技術(shù)研究

打開文本圖片集
中圖分類號(hào):U455.6 文獻(xiàn)標(biāo)志碼:A 文章編號(hào):2095-2945(2025)13-0165-04
Abstract:Takinganultra-higharchdamofahydropowerstationasanexample,thisstudydiscusestheapplicationof damfoundationconsolidationgroutingtechnologyinimprovingdamfoundationstabilityandsafety.Basedontheanalysisof the generalsituationoftheultra-higharchdamproject,thedambodyexcavationandtheoptimizationtreatmentmeasuresof the damfoundationareanalyzed,andthetechnicalanalysisofthefoundationreinforcementmeasuresiscariedout.Duringthe study,about8Oinclinedholeswithadepthof8meterswereconsolidatedgroutingwasimplemented.Ordinaryportlandcement wasused,thewater-cementratiowassetatO.5,andtheoperationwascarriedoutunderstrictlycontrolledpressure.Through soundwavevelocityqualitytesting,theresultsshowthatgroutingsignificantlyimprovesthephysicalcharacteristicsofthedam foundationrockmass,rflectingitsefectivenessinimprovingthestabilityandbearingcapacityoftherockmass.Tisrsearch notonlyimprovestheoverallperformanceofthedamfoundation,butalsoprovidesimportantexperienceforfuturesimilarwater conservancy projects.
Keywords: ultra-high arch dam; foundation; grouting;construction; technology
特高拱壩的建設(shè)是水利工程的重要組成部分,眾多高度超過 3 0 0 m 的拱壩,如 3 0 5 m 的錦屏I級(jí)拱壩和 2 9 4 . 5 m 的小灣拱壩,展示了該地區(qū)在水利工程技術(shù)上的創(chuàng)新與進(jìn)步。(剩余4879字)