升壓站工程預(yù)制地磚面層電纜溝蓋板的研究與應(yīng)用

打開(kāi)文本圖片集
【摘要】電纜溝蓋板是升壓站工程電纜溝施工建設(shè)過(guò)程中的重要部分,電纜溝蓋板施工工藝與設(shè)計(jì)合理性,不僅能夠提升升壓站整體工程質(zhì)量和形象,同時(shí)也能夠?yàn)槠溥\(yùn)作安全性提供有力保障?;诖?,本文將針對(duì)升壓站電纜溝蓋板相關(guān)施工工藝展開(kāi)探討研究,并提出預(yù)制地磚面層電纜溝蓋板在升壓站工程中的應(yīng)用。
【關(guān)鍵詞】升壓站;預(yù)制;電纜溝蓋板
Research and Application of Solden Brick Siding Cable Ditch Covering Brick Side Cable Cover
Abstract: The cable trench cover is an important part of the construction construction of the boosting station. The construction process and design of cable trench cover can not only improve the overall engineering quality and image of the boost station, but also operate for it. Security provides powerful guarantees. Based on this, this paper will discuss research on the construction process of the boosting station cable trench cover plate, and proposes the application of prefabricated brick-layer cable trench cover in the boosting station project.
Keywords: boosting station; prefabrication; cable groove cover
【DOI】10.12334/j.issn.1002-8536.2022.14.051
引言:
在以往升壓站施工過(guò)程中,常規(guī)預(yù)制混凝土蓋板或成品復(fù)核蓋板等存在的龜裂、麻面、氣孔、色差、平整度差、邊角易損、耐久性、尺寸參差不齊、感觀效果差等問(wèn)題,其對(duì)升壓站室內(nèi)地面的整體施工質(zhì)量和形象有著極大影響。(剩余3614字)