海洋平臺(tái)組塊甲板片體生產(chǎn)線協(xié)同調(diào)度方法

打開文本圖片集
中圖分類號(hào):TP18 文獻(xiàn)標(biāo)志碼:A 文章編號(hào):2095-2945(2025)14-0021-06
1,2*,‘,1,1,1,3(1.海洋石油工程股份有限公司,天津 300461;2.哈爾濱工程大學(xué) 船舶工程學(xué)院,哈爾濱150001;3.哈爾濱工程大學(xué)機(jī)電工程學(xué)院,哈爾濱150001)
Abstract:Flexibleassemblylineproductionisacommonproductionorganizationmethod,andthecolaborativescheduling technologyisstudiedacordingtothespecificneedsofcollborativeschedulingofdeckandsheetmixedproductionlineandthe applicationofinteligentrealizationtechnologyofdeckandsheetproductionline.Thecollborativeschedulingmodelofthedeck sheetproductionlinewasestablishedfromthreeaspects:therelevantparametersoftheproduction line,theoptimizationobjective function,theproductionconstraintsandtheassumptions.Inthispaper,animprovedgeneticalgorithmisproposedtosolvethe problem,whichadoptsamulti-layercodingmethodtoensurepopulationdiversityandavoidtheprecociousmaturityofthe algorithm.Asingle-objectiveimprovementalgorithmisdesignedtominimizethemaximumcompletiontimetoreducetheamount ofcomputation.Throughexamplesimulationexperiments,theefectivenessandsuperiorityofthealgorithmareverifedby comparingwiththetraditionalmanualorchestration.Finallthestandardproductionprocessinformationisusedtopreparethe assembly and welding plan.
Keywords:colaborativeschedule;geneticalgorithm;orchestratetheplan;weldingplan;flexibleassemblylineworkshop scheduling
柔性流水車間調(diào)度問題(Flexible Flow ShopSchedulingProblem,F(xiàn)FSP)自提出以來已經(jīng)得到了廣泛而深入的研究。(剩余9937字)