深基坑上跨運(yùn)營(yíng)盾構(gòu)隧道MJS加固方案優(yōu)化分析

打開(kāi)文本圖片集
中圖分類(lèi)號(hào):U231 文獻(xiàn)標(biāo)志碼:A 文章編號(hào):1005-8249(2025)02-0060-08
DOI:10.19860/j.cnki.issn1005-8249.2025.02.011
Abstract:Inordertodeterminetheverticalupliftand horizontal deformationlawsofashieldtunnelconstructiononadeep foundationpit,acrossectiontunnelprojectonadeep foundationpitwastakenastheresearchobject.Thefiniteelement analysis method wasused to studythedeformationlawsofthetunnelunder diferentbasereinforcementareas,reinforcement depths,andreinforcement methods.Theresultsshow thattheuseof MJS basereinforcement method in silty strata can efectivelycontroltheupliftandhorizontaldeformationof tunnels,andreduce therelativedeformationoftunnelsections;The upliftdeformationofthetunneldecreaseswiththeincreaseofthebasereinforcementarea,andfullbotomreinforcement measuresshouldbetakentocontrolthedeformationofthetunel structure;Asthedepth offoundationreinforcementincreases, theupliftdeformationofthetunneldecreases.Afterthedepthoffoundationreinforcement excedsacertainlimit,increasingthe reinforcementdepthweakenstheefectofreducinguplftdeformation;Theportalreinforcementsystemformedbythe reinforcementofthestrataandfoundationonbothsidesofthe tunnelhassignificantadvantagesincontrolingthedeformationof thetunnel structure.Thehorizontaldeformationandupliftdeformationofthetunneldecreasewiththeincreaseofthe reinforcement width on both sides,and the optimal reinforcement width on both sides is 2 m .The research results can be used as a reference for similar projects.
Key words:pit;running tunnel;MJS construction method;numerical analysis;deformation;reinforcement plan
0 引言
隨著我國(guó)城市化的不斷發(fā)展,城市地下空間開(kāi)發(fā)利用增長(zhǎng)迅速,新建地下工程不可避免以鄰近、上跨、下穿等多種方式臨近既有地下建(構(gòu))筑物施工,增加了施工難度,對(duì)保障既有建筑安全提出了更高的要求。(剩余8194字)